The authority office carried out road painting and marking installation work in Entoto-Kebena riverside development project.

The authority carried out road painting and marking installation in Entoto-Kebena riverside development project. He carried out road painting and installation of signs and indications on the Ontoto-Kebena riverside development project. Pedestrian crossings /Zebra/ in the same riverside project; Road side yellow paint, the Italian Embassy area, which can hold 22 vehicles, and July 19 Park Area has carried out road paint work on surface parking markings, which can park 33 vehicles. In the infrastructure, river defense walls and modern bridges have been painted with yellow road paint, and informational signs and indicators have been installed in the areas. The Addis Ababa Traffic Management Trainee is known to be a leading participant in the city's projects, corridor developments and riverside projects with a 24/7 work culture such as road painting, installation of signs and indicators. For more information click the link below and follow us. https://linktr.ee/aatma1 Free phone line 696




Leave a comment



Copyright 2026 TMA © All Rights Reserved
Email Address: aartma2011@gmail.com
Phone Number: 696 TMA Free Line  AND  0116672386

Developed by Tewodros Kemal(@EaseWD)