Current aspect of the construction of the longest traffic suspension bridge
Addis Ababa, December 15, 2016: The transit bridge, which is one of the 3 traffic bridges being built as part of the Kaliti-Tulu Dimtu road construction project, and built at the junction of the Kaliti Training Ring Road, is nearing completion.
It's close.Preparations are being made to pave the bridge and open it for traffic.
This drawbridge is 240 meters long and is the largest and longest of the three bridges on the Kaliti-Tulu Dimtu road project.
Since the drawbridge was built high without touching the former ring road square, it not only eases the traffic movement, but also adds a special beauty to the area.
This traffic transfer bridge built on the ring road receives the traffic coming from Saris Abo and transfers it to Kaliti, and the existing square below it creates a comfortable environment for vehicles passing to Saris Abo and Haile Garment Square.
Join Addis Ababa City Roads Official Social Network Pages:-
Telegram: https://t.me/AddisRoads
Facebook :- https://www.facebook.com/AbabaCity
Twitter:- https://twitter.com/AbabaCity
Instagram: https://www.instagram.com/addisababaroads/
Visit our website:- http://www.aacra.gov.et