wd_asp id=1

The light rail is being resolved by a solution in areas where you pass through the traffic motion ******** …

The solid rail is being resolved by a solution to the traffic range *********** This will result in additional cost and loss of time, and in general, the general impact on traffic activity. By doing this, the second majority vehicle passenger is opened in some parts of the Kridld Development. This vehicle transfer path is considered as one of the demonstration of a solution, which opened on the road closure of the fertility hotel area. We have always accepted the opinions and suggestions of society, in conjunction with the strategic plan of the city, which we are diligently to respond to the study of the city. Addis Ababa ABABA City Roads Authority / Addis Ababa City Roads Authority


Leave a comment



Copyright 2025 TMA © All Rights Reserved
Email Address: aartma2011@gmail.com
Phone Number: 696 TMA Free Line  AND  0116672386

Developed by Tewodros Kemal(@EaseWD)

Back
Telegram