Mayor Adanech Abebe said to the Addis Ababa council members about the city's development corridor work: It has been presented to the city administration cabinet for approval. 👉 The results of the study showed us that large built infrastructures were not connected in the corridors where the study was conducted, high traffic congestion, lack of implementation of urban planning and urban system, especially lack of sewage and flood drainage, electricity and telephone lines intertwined like spider webs, lack or absence of toilets and cooking facilities, people only at home. Not only that, but also that they are forced to live on the edge and are frequently exposed to man-made and natural disasters. Gotera Wolo Sefer Square, Kefour Kilo Cross Square and Bole Bridge, at the intersection of Addis Africa Convention/Exhibition Center, the basic road corridor development works will be completed in a short time and the services will be open to the public 24/7. 👉By making the city's structural plan, the experience of experts who have experience in the field is studied and prepared for the development of a corridor that is in line with the current situation of our own city, the study has been presented to stakeholders at every level, including the materials found in discussion and approved by the city administration cabinet. 👉 The result of the study showed that large infrastructure are not connected in the corridors where it was conducted, high traffic congestion, the lack of urban planning and urban order, especially the lack of sewage and sewage removal, electricity and tele cables that are webs like spider, lack of toilet and kitchen space, people are not only at home but also saving. They are forced to live in and exposed to man-made and natural disasters. 👉According to this 48.7 km. May cover and redevelopment in five corridors of our city namely 4 kilo piazza and Adwa victory memorial, from 4 kilo square in English embassy in Megenagna, from Mexico grass house in Gotera Wollo neighborhood square, from four kilo cross square and Bole bridge, from Megenagna to New Africa convention/exhibition center which will be fundamental in a short time. The road corridor development works are completed and the services are being made 24/7. ·